Shenyang

Home Nuclear Power News National News Shenyang

16.07.12 Approval on the design and manufacture of nuclear safety class 2 pumps for 1000 MW NPPs in the National Science & Technology Pillar Program during the Eleventh Five-year Plan Period

Attention: open in a new window. PDF Print E-mail

Monday, 16 July 2012 08:57

Key words: Eleventh Five-year Plan, nuclear safety class 2 pumps, approval

The design and manufacture of nuclear safety class 2 pumps for 1000 MW NPPs in the National Science & Technology Pillar Program during the Eleventh Five-year Plan Period have been approved recently. The project was undertaken by the Shenyang Blower Works Group Corporation (SBWGC).

Read more: Approval on the design and manufacture of nuclear safety class 2 pumps for 1000 MW NPPs in the National Science & Technology Pillar Program during the Eleventh Five-year Plan Period

 

Page 1 of 5

«StartPrev12345NextEnd»

1509, Zhongyu Plaza, A6 Gongti North Road,Chaoyang District, Beijing China | tel: +86 10 64681222
Dynabond Powertech © 2010. All rights reserved | Disclaimer | Privacy Statement | Sitemap | Web Design Beijing by Crystal Asia.