Monday, 25 June 2012 00:00
Key words: Ningde, Unit 1, TUY
The TUY check during the heat test of Ningde NPP Unit 1 involved TUY52 (master device support gap measurement), TUY54 (heat loss measurement), TUY55 (tube thermal displacement measurement), and TUY56 (nuclear island auxiliary system bracket check). In order for the TUY inspection to run safely and orderly, CNI23 made comprehensive arrangement and preparation for the whole process.
Page 9 of 101
«StartPrev12345678910NextEnd»1509, Zhongyu Plaza, A6 Gongti North Road,Chaoyang District, Beijing China | tel: +86 10 64681222
Dynabond Powertech © 2010. All rights reserved | Disclaimer | Privacy Statement | Sitemap | Web Design Beijing by Crystal Asia.