Jiangsu Nuclear Power communicated on AE management model with Electricite de France

PDF Print E-mail
Wednesday, 14 September 2011 10:06

Recently, Jiangsu Nuclear Power invited Fang Deyi, General Manager of Electricite de France’s Chinese nuclear power department to the TianWan Base. They made a communication about AE management model.

Electricite de France representative introduced the French electricity company information, AE mode and the French electricity company EPR project organization management. They discussed on the AE hierarchical structure and operation mode with the participants.

This communication promotes mutual understanding. It also furthers the knowledge on the AE model of EDF. It is an important reference with the follow-up of TianWan nuclear power construction.

http://www.china-nea.cn

 

1509, Zhongyu Plaza, A6 Gongti North Road,Chaoyang District, Beijing China | tel: +86 10 64681222
Dynabond Powertech © 2010. All rights reserved | Disclaimer | Privacy Statement | Sitemap | Web Design Beijing by Crystal Asia.